Turmalina Dam

Decharacterization Status: The Turmalina Dam has been undergoing decharacterization since July 2021. The fourth and final stage of the works is currently under way, comprising the final covering of the reservoir with topsoil and revegetation, the installation of the internal drainage system, the installation of complementary instrumentation and the regularization of the perimeter channels.

Geotechnical Monitoring: Geotechnical monitoring has been carried out since 2009 using piezometers, water level indicators, surface survey monuments, monitoring wells, a flow meter and a rain gauge. In addition, the structure has been monitored remotely by InSAR radar since May 2026.

No significant geotechnical, structural or hydrological alerts were recorded in the period assessed. The instruments have risk charts with predefined control levels and monitoring criteria, including response protocols for each monitored condition. If attention or alert levels are reached, the planned actions include intensified monitoring, extraordinary inspections, specialized technical assessments and the implementation of corrective measures, where applicable.

Hydrological Assessment: The 2025 and 2026 hydrological assessments were prepared by HIDROBR, using as reference the Probable Maximum Precipitation (PMP) defined by WALM in 2024, as it represents a more critical scenario than the 10,000-year return period.

Technical Characteristics of the Turmalina Dam

Location: Conceição do Pará - MG

Heigth: 19,75 meters

Length: 198 meters

Current Volume: 780.999 m³

Construction Method: Downstream Raising

Mining Dam Emergency Action Plan Turmalina (PAEBM):

Third Party Companies Report

Moisture Content and Dam Level Report

Environmental Monitoring Report