Paciência Dam

Decharacterization Status: The detailed engineering design for the decharacterization of the Paciência Dam is under development, with completion of the works scheduled for December 2027.

Geotechnical Monitoring: Geotechnical monitoring has been carried out since 2013 using Casagrande piezometers, water level indicators, surface survey monuments, flow meters, a rain gauge, an evaporimeter and a staff gauge. In addition, the structure has been monitored remotely by InSAR radar since May 2026.

No significant geotechnical, structural or hydrological alerts were recorded in the period assessed. The instruments have risk charts with predefined control levels and monitoring criteria, including response protocols for each monitored condition. If attention or alert levels are reached, the planned actions include intensified monitoring, extraordinary inspections, specialized technical assessments and the implementation of corrective measures, where applicable.

Hydrological Assessment: The 2025 and 2026 hydrological assessments were prepared by HIDROBR based on the Probable Maximum Precipitation (PMP) calculated by GHT in 2023, as it represents a more conservative scenario than the 10,000-year return period.

Technical Characteristics of the Patience Dam

Location: Itabirito - MG

Heigth: 41,40 meters

Length: 245,93 meters

Current Volume: 1.271.800,68 m³

Construction Method: Downstream Raising

Mining Dam Emergency Action Plan (PAEBM):

Third Party Companies Report

Moisture Content and Dam Level Report

Environmental Monitoring Report