Decharacterization Status: The Moita Dam has been undergoing decharacterization since March 2023, with completion scheduled for December 2027. The first and second stages of the works have been completed and the third stage is under way.
Geotechnical Monitoring: Geotechnical monitoring has been carried out since 2013 using piezometers, water level indicators, surface survey monuments, environmental monitoring wells and a rain gauge. In addition, the structure has been monitored remotely by InSAR radar since May 2026.
No significant geotechnical, structural or hydrological alerts were recorded in the period assessed. The instruments have risk charts with predefined control levels and monitoring criteria, including response protocols for each monitored condition. If attention or alert levels are reached, the planned actions include intensified monitoring, extraordinary inspections, specialized technical assessments and the implementation of corrective measures, where applicable.
Hydrological Assessment: The hydrological assessments were prepared by HIDROBR. In 2025, the Probable Maximum Precipitation (PMP) calculated by GHT in 2023 was adopted, as it represents a more conservative condition than the rainfall associated with a 10,000-year return period. In 2026, the 10,000-year return period rainfall was used, as it represents the most restrictive condition for the structure.
Location: Caeté - MG
Heigth: 19 meters
Length: 388 meters
Current Volume: 327.899,00 m³
Construction Method: Single Step